Welcome to visit zirconia ceramics Middia website

The Ministry of Water Resources issued the "Notice on Strengthening the Demonstration and Review of Rigid Constraints on Water Resources in Water Resources Allocation Projects"

Release time:2024-08-28click:1
In order to implement the requirements for rigid constraints on water resources, support the scientific decision-making of water resources allocation projects, and promote the high-quality development of water conservancy in the new stage, the General Office of the Ministry of Water Resources recently issued the "Notice on Strengthening the Demonstration and Review of Rigid Constraints on Water Resources for Water Resources Allocation Projects" ( (hereinafter referred to as the "Notice").
The "Notice" emphasizes that the main goal is to promote the scientific utilization, conservation and protection of water resources, and to do a good job in feasibility on the basis of carefully reviewing the rationality of the scale of water withdrawals in water resource allocation projects. In the research stage, the review of rigid water resource constraints will focus on the compliance with the rigid water resource constraints indicators such as regional total water consumption control indicators, river basin water distribution plans, and river and lake ecological flow guarantee targets, so as to resolutely suppress unreasonable water demand and effectively protect rivers. Improve the ecological environment of the lake, prevent over-exploitation and utilization of water resources, and provide strong support for the sustainable and healthy development of the economy and society.
The "Notice" clarifies the key tasks of demonstration and review of rigid water resource constraints:
First, do a good job in coordinating the regional total water consumption control indicators Compliance review. Focus on reviewing the compliance of regional allocation water volume with total water consumption control indicators. If the current water use in the region has exceeded the total water consumption control indicator, no new water resource allocation projects shall be built to increase water consumption, except for necessary domestic water, replacement of overexploited groundwater, and return of ecological water occupied by rivers and lakes. If the current water use in the region does not exceed the total water consumption control indicator, the sum of existing stock water use and incremental water use shall not exceed the total water consumption control indicator.
The second is to review the compliance with the water allocation plan for the river basin. If surface water is used as the water supply source, the planned annual surface water allocation volume after the new water supply volume of the water resources allocation project must comply with the control indicators of the river basin water allocation plan. If the current water supply exceeds the control indicators of the water distribution plan, it shall not be used as a new water supply source.
The third is to conduct a compliance review with the control section discharge flow (water volume, water level). The rationality of the ecological flow indicators and discharge measures of the project should be reviewed in accordance with the requirements of relevant technical standards. Analyze the scope of influence of water withdrawal in water resource allocation projects, review the possible impact of setting water withdrawal scale and process under different water inflow conditions on the ecological flow guarantee target and water distribution plan cross-section control indicators within the scope of influence, and analyze the ecological flow guarantee target and water distribution plan. The degree of satisfaction of section control indicators. For special ecological protection objects and rivers that involve ecological flow in sensitive periods downstream of the project section, the impact on ecological flow in the sensitive period should be analyzed.
The "Notice" requires that for water resource allocation projects reviewed by the Ministry of Water Resources based on management authority, all river basin management agencies should conduct a review of rigid water resource constraints in the feasibility study stage as required; local water resources Administrative departments are responsible for reviewing water resources that are reviewed by local governments.Configuration projects should also be implemented based on local realities.
lable:

Quick Links
Xiamen Middia Biological Ceramic Technology Co.,Ltd
Xiamen Middia Biological Ceramic Technology Co.,Ltd
address
address:Room 305, No. 891 Fanghubei 2nd Road, Huli District, Xiamen City, Fujian Province, China
Contact Us
  • Telephone:86-15396283716
  • E-mail:1617844001@qq.com

Copyright © 2010 zirconia ceramics factory,zirconia ceramics manufacturer,zirconia ceramics company,zirconia ceramics manufactor,zirconia ceramics price,zirconia ceramics telephone middia All Rights Reserved. XML map

Top